Build journal
Every stage of the build, article by article.
Article 39: Terrace foundations
Article 38: Retaining wall foundation
Article 37: Workshop foundations
Article 36: Excavation under the terrace
Article 35: Finishing the earth plaster
Article 34: OSB floor and underfloor heating
Article 33: Partitions and wall finishes
Article 32: Earth floor and technical networks
Article 31: Looking back at the Origo festival
Article 30: Kitchen, shower and technical room
Article 29: Raclette evening
Article 28: Forgotten boxes and cut tiles: the final adjustments
Article 27: The exterior is almost finished
Article 26: Tiles in the rain
Article 25: Sponge texture and holidays
Article 24: Smoothing and fitting the panels
Article 23: Making our own solar absorbers
Article 22: At last, windows
Article 21: Spraying begins
Article 20: The cork and the countdown
Article 19: Kittens and facade preparation
Article 18: Roof problem: when water gets in
Article 17: Reinforcements from Geneva
Article 16: Technical installation under way
Article 15: The house stands up
Article 14: Preparing for the lift
Article 13: Mulled wine and raclette evening: a break and our thanks
Article 12: The load-bearing straw walls are done
Article 11: Under the snow
Article 10: Site routine: one wall a day
Article 9: Filling with straw: first attempt
Article 8: First cassettes at the carpenter's
Article 7: Setting up the site: the awning becomes our HQ
Article 6: The foundations arrive: installing the Krinner screws
Article 5: First lessons: when the water table plays tricks
Article 4: First shovelfuls: the building site has officially started
Article 3: Participatory weekend: volunteers in action
Article 2: The straw harvest: when wheat becomes your home